Express vs. Local Multi-Stop Crossover
Live stop-by-stop door-to-door totals (wait + Clock-Trust risk + crawl-adjusted ride) across 10 NYC express/local trunks. Shows stops up to the crossover point, then collapses redundant downstream stops. Verified Always-OOS across 65,518 Monday trips: Take Local 84.6% (+3.6m) · Wait Express 94.4% (+5.7m) · Post-crossover 89.6% (+4.2m).
LIRR & Metro-North Live Status
Live branch delays updated every 60s. From our 6.42M-row commuter rail audit:
LIRR clocks are highly reliable (0.7% phantom, 55s MAE at 2–5m), while
Metro-North clocks run late more often (18–26% arrive ≥ 2m after feed ETA — pad tight transfers).
Verified Out-of-Sample Track Record
Every number below is measured strictly out-of-sample (before the future happens) with forward embargo enforcement — never backfitted.
Probability Calibration (All 10 Bins)
When SubWait says a probability (e.g. 75%), how often does it actually happen? Closer to the dashed diagonal means honest, trustworthy percentages.
Accuracy by Subway Line (22 Months OOS)
High-frequency isolated trunks (1, 6, 7, L) are strongest. Heavily branched / sparse lines (A, N, D, G, J, 5) have wider error bars and are explicitly flagged in the live view.
| Line | 15m Wait MAE | 15m R² | Onset Hit @50% | Clearing Hit @70% | Relapse Risk | Empty Follower |
|---|
Live Countdown Clock Trust Badges
Audited across 8.63M real-time MTA countdown updates (303,231 verified stop arrivals). SubWait flags untrustworthy countdowns automatically: Phantom Risk (unassigned B-Div trains vanish 8.7× more often, up to 31% on the D and 37% when unassigned & drifting), Clock Sliding (cumulative slip ≥ 2–3m doubles ≥ 2m lateness and triples ≥ 5m delays), and Stale Clock (train telemetry silent ≥ 90s doubles ≥ 2m lateness).